View Project

Norwegian AI Directory

Real-time Reservoir Monitoring Integrated with Stress Field Modelling to Allow for Early Detection of Deformations and Leakages


Description:

To reduce the environmental impact from the Norwegian petroleum operations, produced waters are often re-injected in dedicated shallow aquifers or re-used for EOR purposes. Such injection processes and general pressure management pose risks of leakage or even cap-rock failure. Misinterpreted pressure management may result in rapid deformation, often manifested as micro-earthquakes or even larger magnitude earthquakes. The three main knowledge needs targeted in this proposal are: 1)we need to know how to characterize microseismic events such that we can quickly discriminate events to belong to class-I (pressure induced events) or class-II (stress triggered events) type of events 2)we need to understand through geomechanical modelling under which circumstances we can expect class-I and class-II type of events 3)we need to increase the competence in integrating real-time microseismic monitoring with geomechanical modelling such that there is a feedback loop between monitored deformation and stress field modelling. Solving these knowledge gaps, we will get closer towards workflows for early warning systems towards leakage detection and pressure management in particular during re-injection of produced water. The proposed project consists of three scientific work packages that will be based on the analysis of high-resolution industry datasets. The main dataset will be provided by Statoil and will consist of passive seismic data from an ocean-bottom cable system offshore Norway (likely Snorre or Grane fields). From the same field we will receive all relevant geomechanical model information. The secondary dataset will also be provided by Statoil and will consist of passive seismic data from onshore hydraulic fracture stimulation. This dataset will serve as a controlled test experiment for both microseismic analysis and geomechanical stress modelling, before transferring the gained knowledge to the offshore Norway case, where noise conditions pose an additional challenge.


Project leader: Andreas Wuestefeld

Started: 2015

Ends: 2018

Category: Teknisk-industrielle institutter

Sector: Instituttsektor

Budget: 7192000

Institution: STIFTELSEN NORSAR

Address: Lillestrøm